We find the most optimal and cost-effective
path to revive your solar asset project.

CONSULTING   |   OUR PROCESS   |   80/20 RULE

We find the
most optimal
and cost-effective
path to revive your
solar asset project.

CONSULTING   |   OUR PROCESS   |   80/20 RULE

DO YOU STRUGGLE WITH?

Technical Challenges

  • Integrating energy storage into your project
  • Understanding repower engineering solutions
  • Processing warranty claims
  • Replacement parts difficult to find, not compatible, or don’t exist
  • Poor construction or O&M workmanship
  • Constantly changing system design and installation techniques
  • Keeping up with new module, inverter, and tracker technology

Financial Challenges

  • Repowering project costs and ROI
  • Calculating the 80/20 rule
  • FMV appraisal of existing equipment
  • Modeling energy storage
  • Finding capital to perform repowering work
  • Evaluating partner capital accounts & depreciation recapture upon potential sale

As a Solar Asset Owner,
do you struggle with any
of the following issues?

Technical Challenges

  • Integrating energy storage into your project
  • Understanding repower engineering solutions
  • Processing warranty claims
  • Replacement parts difficult to find, not compatible, or don’t exist at all
  • Poor construction or O&M workmanship
  • Constantly changing system design and installation techniques
  • Keeping up with new module, inverter, and tracker technology

Financial Challenges

  • Repowering project costs and ROI
  • Calculating the 80/20 rule
  • FMV appraisal of existing equipment
  • Modeling energy storage
  • Finding capital to perform repowering work
  • Evaluating partner capital accounts & depreciation recapture upon potential sale

CHARACTERISTICS OF A GOOD REPOWERING PROJECT

Opportunity to max out DC capacity under existing AC interconnection to produce more kWh’s.

Underperforming sites that need to replace modules & inverters

Potential to add energy storage.

Ability to obtain new financing to complete repairs. Projects qualify for new
tax credits if we replace >80% of the existing equipment (80/20 rule).

Favorable market rates at end of original PPA term

CHARACTERISTICS
OF A GOOD
REPOWERING PROJECT

Opportunity to max out DC capacity
under existing AC interconnection
to produce more kWh’s.

Underperforming sites that need
to replace modules & inverters

Potential to add energy storage.

Ability to obtain new financing to
complete repairs. Projects qualify
for new tax credits if we
replace >80% of the existing
equipment (80/20 rule).

Favorable market rates at
end of original PPA term